Hoping to finish my son's Comic Strip Quilt first; it's nearing completion, but I didn't get nearly the sewing time in our school/work break as I thought I would so now need to get going again.
It's an original design, here's the EQ7 sketch I made of it.
Attachment 3854_nd_Read_All_Over.JPG not found
The left and right side panels are done (the all black and all white sections), the frames are made for the middle section but waiting on him to finalize selection of which of his comic strips we'll photograph and print on fabric for the centers of that section (he draws a comic strip and other art, so using printable fabric we'll highlight his own artwork in the quilt), and 2.5 of the 4 pieced borders are done -- they are a modified morse code to spell out a message for him. I'm finishing up the borders then will push him to pick the comics, photo those, print them, assemble that middle section and then put the top all together. Then just have to go buy batting and -gulp!-, quilt it!
will be the first bed sized quilt I've quilted; it will be for a full size bed. The only other things I've quilted so far were the baby quilt and the tree skirt. I'm planning to use gray thread and some red thread in the red parts so it blends

Not brave enough to do quilting that stands out, and the focus is meant to be the comics so I don't want to detract from that.
Once I finish this, hopefully end of January at the latest!, I'll start the Brazil quilt for BJ's architecture challenge. Although, a friend just posted photos to facebook of a grand mosque in Dubai.....imagine 1000 pure white columns, each topped with a golden pineapple and covered all over with marble vines/flowers -- stunning. Saw the photo and thought "ooooh, there's a gorgeous quilt....." (sigh) Will have to wait, as I've pledged to myself to finish the projects waiting in the cabinet before buying fabric for new projects.
I have:
-Comic Strip Quilt ("due date" of jan 31)
-Brazil Quilt (due date of end of March, right BJ?)
-middle son's quilt (due date of end of May or June, when it gets cold here)
-Radiant Suns quilt (maybe by August? September?)
-finish my diary quilt (by October, I hope)(it's mostly done, just waiting on sashing and borders)
-work all year on a BOM I'm following on-line, using fat quarters from my stash (so, due date, December)
-finish a Christmas wall hanging I started this Christmas, but am doing by hand so going slow (by next December)
THEN I can start new ideas, LOL! All of these are either started or at least drawn/have plans and fabric. I have many other plans that don't have fabric yet, so I'm trying to finish the ones that do before buying fabric for those that don't. Wish me luck! I started a new quilting only blog ---
http://quiltingonawhim.blogspot.com.br/ -- if anyone wants to take a peek. It's still a work in progress, too, but it's getting there!